Chantier | Interior floor protection for a dog daycare and boarding facility in Auckland looking after over 500 dogs at various times. 800m2 floor split into 5 different areas for different activities |
---|---|
Localisation | Nouvelle-Zélande |
Sous-catégorie | PALAIS |
Demande |
Installation of Mapeoor Sytem 31 HD with Mapeoor Finish 57
The concrete floor was ground using an industrial grinder and a coat of Primer SN epoxy primer was installed. This was followed by a coat of the Mapefloor I 302 SL high build solvent-free epoxy and a top coat of the Mapefloor Finish 57 was installed as a final abrasion-resistant floor coating. The applicator recommended the Mapefloor Finish 57 to their customer due to their previous success with the product being used in a very aggressive environment. |
Date de début et de fin | 2019 |
Type de demande | Sols industriels a base de ciment ou resines |
Entreprise de sous-traitance | Epoxy Flooring |
Installateurs | Epoxy Flooring |
Coordination MAPEI | Scott Lacey |