Chantier | Guangdong Olympic Aquatics Centre |
---|---|
Localisation | Guangzhou, Chine |
Sous-catégorie | PISCINE |
Construit en | 2009 |
Ouvert en | 2010 |
Demande | Tile installation system in using Keracrete System and Keracolor GG + Fugolastic was selected for the application. |
Type de demande | Sols/murs |
Titulaire | Guangdong Construction Engineering Group Ltd |