Chantier | The new South Beach Hotel |
---|---|
Localisation | Singapour |
Sous-catégorie | HOTEL |
Construit en | 2012 |
Ouvert en | 2015 |
Demande | Adhesives solutions for the South Beach hotel |
Date de début et de fin | 2012/2015 |
Type de demande | Sols/murs |
Entreprise de sous-traitance | Hyundai Engineering & Construction Co. Ltd |
Installateurs | ASR Building & Conservation Pte Ltd, Aegis Building & Engineering Pte Ltd, SJ Marble (Singapore) Pte Ltd |
Architectes | Aedas Pte Ltd |
Distributeur MAPEI | Mapei Far East Pte Ltd |
Other |
Mapei adhesives were used extensively in the washrooms of all 654-guestrooms and hotel lobby. In both areas, Keraflex was used for fixing marble onto floors and Keraflex Maxi S1 was used for fixing marble onto walls. Keracolor SF was used for grouting the joints. |