Chantier | tennis courts and netball courts |
---|---|
Localisation | Ascot Vale (Melbourne), Australie |
Sous-catégorie | CLUB DE GOLF, COURTS DE TENNIS |
Demande |
Installation of Mapecoat System on tennis courts and netball courts
Surface Preparation sequence; • Clean and prep new concrete bases post 28 days curing using a combination of mechanical (diamond) grinding and high-pressure water blasting. Surfacing System sequence; • Apply ‘Mapecoat I 600 W Primer’ to courts. • Minor patching & levelling of new concrete surface as required using Mapecoat TNS White Base Coat • Apply ‘Mapecoat TNS Finish 1 – Velocity Blue’ to the centre of courts. (First ‘finish’ coat) • Apply ‘Mapecoat TNS Finish 1 – Velocity Blue’ to the centre of courts. (Second ‘finish’ Coat) • Apply ‘Mapecoat TNS Finish 1 – True Blue’ to the perimeter of courts. (First ‘finish’ Coat) • Apply ‘Mapecoat TNS Finish 1 – True Blue’ to the perimeter of courts. (Second ‘finish’ Coat) • Apply ‘Mapecoat TNS White Lines’ for tennis to courts. • Apply ‘Mapecoat TNS Yellow Lines’ for netball to courts. |
Date de début et de fin | 2019 |
Type de demande | Solutions pour sols sportifs, Preparation des supports |
Titulaire | Tennis and Netball Centre |
Entreprise de sous-traitance | Turf One Pty Ltd |
Installateurs | King of Courts Pty Ltd |
Responsable de projet | Moonee Valley City Council |
Coordination MAPEI | Nicolas Cheal |