Chantier | floors in rooms, the cooridors, and offices |
---|---|
Localisation | Olten, Suisse |
Sous-catégorie | VILLAGE DE RETRAITE |
Demande |
All floors were laid with hard coverings. For the construction joints Primer MF EC Plus and Quarzo 0.9 were used. The anhydrite subfloors were primed with Eco Prim T Easy before being fully leveled with Ultraplan Eco.
Once the levelling compound had dried, the rooms were laid with LVT flooring and bonded with Ultrabond Eco V4SP Fiber. The corridors, offices and reception rooms were laid with Forbo Step PVC sheeting (extra slip-resistant flooring) and also bonded with Ultrabond Eco V4 SP Fiber. |
Date de début et de fin | 2023 |
Type de demande | Sols |
Entreprise de sous-traitance | WSG AG, Basel |
Installateurs | Inevo AG, Pratteln |
Architectes | Fsp architekten, Spreitenbach |
Responsable de projet | Tertianum Management AG, Dübendorf |
Coordination MAPEI | Patrick Zengaffinen |