Chantier | pools and locker rooms |
---|---|
Localisation | London, Royaume-Uni |
Sous-catégorie | ECOLE |
Ouvert en | 2016 |
Demande | waterproofing and ceramics installation |
Type de demande | Sols/murs |
Entreprise de sous-traitance | Jerram Faulkus |
Installateurs | Tiletec Group |
Other |
Throughout the extensive project, Mapei systems were specified from the substrate to the finishing materials, in order to provide a warrantable system build-up. The total application included 2,500 m2 of Mapei products from screed binders, render substrates and a range of floor and wall adhesives. The new two-storey building consists of a six lane competition swimming pool and wet changing facilities on the ground floor. The second floor comprises of a fitness suite with the project including a re-fit of existing sports hall and dry changing areas. |