Chantier | The 35.5-metre-high grain silo with 19 interior grain chambers has space for 2 800 tonnes of grain. The grain silo was built in 24-hour operation. Construction took a total of 212 hours, or just under nine days. |
---|---|
Localisation | Hallau, Suisse |
Sous-catégorie | SILOS |
Demande | The new construction of the additional grain silo in Hallau was built in 24-hour operation. The building was erected using slipforming, which was raised in three-minute cycles. |
Date de début et de fin | 2022 |
Type de demande | Reparation des betons |
Installateurs | KIBAG Beton AG |
Responsable de projet | Neumühle Hallau GmbH |
Coordination MAPEI | Reto Märki |