Chantier | Mapei renovation and tiling systems have been used as part of an extensive redevelopment at Gatwick Airport Station. |
---|---|
Localisation | London, Royaume-Uni |
Sous-catégorie | GARE |
Demande |
The project, which was carried out by DMC Contracts for Costain, included construction of a new second concourse and airport entrance, doubling available space for passengers accessing the airport terminal.
Before the pandemic, more than 21 million journeys were made through Gatwick Airport Station every year, and those passenger figures are rapidly recovering. Providing a ‘bigger, better and brighter’ space, the new concourse is the size of eight tennis courts and has created 500m2 of extra space in the existing station concourse. The upgraded station is fully accessible to all passengers and includes eight new escalators, five new lifts, new stairways and widened platforms, as well as new information areas, wide ticket gates and a dedicated passenger assistance point. |
Type de demande | Sols, Tile & stone installation systems |
Entreprise de sous-traitance | Costain |
Installateurs | DMC Contracts |