Chantier | New wood-look PVC flooring was laid on 664 m2. |
---|---|
Localisation | Villars-sur-Glâne, Suisse |
Sous-catégorie | CRECHE |
Demande |
The floor of the Cap Canaille day care centre was renovated. The existing tiles were sanded down and spot filling was carried out with Planiprep Fast Track.
Then the very low-emission bonding primer Eco Prim Plus was applied and smoothed with Ultrabond Eco Xtra. Thanks to these substrate preparations, the new PVC flooring met the local standards. |
Date de début et de fin | 2021 |
Type de demande | Revetements de sols/murs |
Architectes | FACE à FACE à Genève |
Responsable de projet | Cap Canaille du groupe Babilou |
Coordination MAPEI | Marcello Maieron |