Chantier | Angereds Bad och isanläggning |
---|---|
Localisation | Angered, Suède |
Sous-catégorie | PISCINE |
Construit en | 2012 |
Ouvert en | 2013 |
Demande | Angereds Bad och isanläggning |
Date de début et de fin | 2012/2013 |
Type de demande | Impermeabilisation |
Titulaire | Higab gruppen |
Entreprise de sous-traitance | PEAB AB |
Installateurs | Åskloster Mur o Kakel AB |
Architectes | Erseus Arkitekter AB |
Responsable de projet | Peter Erseus |
Distributeur MAPEI | Göteborgs Kakelhus |
Crédits | Marie Sködin |
Responsable de projet | Magnus Attemalm |
Other |
Construction of a public arena in Angered (Gothenburg) This arena was originally a contest between architect companies. The goal was to construct a combined swim bath, ice arena and athletics arena “in one”. The winner became Erseus architects AB. Directly when the winner was announced Mapei and Modena took contact, and together we formed a concept with ceramics, membranes, adhesives and grouts for the swimming pools and surrounding areas such as showers, spa area and changing rooms for all parts. The swimming pool concept is from concrete repair and surface preparing until finished surfaces. |