Rothorn Sörenberg

Location icon Sörenberg, Schweiz
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Ref #: 4658
Kategori: INFRASTRUKTUR

Konstruktion

Gård ceiling of the passage tunnel
Lokation Sörenberg, Schweiz
Subkategori TUNNEL
Anvendelse At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Start- og afslutningsdato 2023
Anvendelsestype Underjordiske konstruktioner
Montørfirmaer Gasser Felstechnik AG, Lungern
Projektleder Rothornbahn Sörenberg
Points Ramon Lehmann Fotografie
MAPEI-koordinering Urs Wirth

Produkter brugt til dette projekt

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not available for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not available for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not available for this market,
contact us

Hold kontakten

Abonner på vores nyhedsbrev, og få sidste nyt fra Mapei