Baustelle | pools and wet areas |
---|---|
Standort | West Bromwich , Großbritannien |
Unterkategorie | Sportzentrum |
Gebaut | 2013 |
Eröffnet | 2014 |
Anwendung | waterproofing and ceramic tiles installation |
Anfangs- und Abschlussdatum | 2013/2014 |
Art der Anwendung | Neubauten |
Bauunternehmen | Pellikann |
Architekten | Roberts Limbrick |
Beschreibung | Mapei was specified throughout for a system build up and warrantable system. Mapei products were used from the concrete up to the finishing materials, including screed, render, waterproofing, tile adhesives, grout and silicones. Various detailing issues were overcome with the inclusion of the technical department assisting including the drainage channels. This project is the first for Pellikann where a single manufacturer has been used like this and this will now be rolled out for future leisure centres using Mapei products. Full site support has been given with various visits made to site to follow through on works and assisting both the Main contractors and sub contractors |
Copyright © 2024 MAPEI S.p.A. Alle Rechte vorbehalten
MAPEI GmbH - Babenhäuser Str. 50, 63762 Großostheim - DE
Fax +49-6026-50197-48