Baustelle | Interior floor protection for a dog daycare and boarding facility in Auckland looking after over 500 dogs at various times. 800m2 floor split into 5 different areas for different activities |
---|---|
Standort | Neuseeland |
Unterkategorie | Dogenpalast |
Anwendung |
Installation of Mapeoor Sytem 31 HD with Mapeoor Finish 57
The concrete floor was ground using an industrial grinder and a coat of Primer SN epoxy primer was installed. This was followed by a coat of the Mapefloor I 302 SL high build solvent-free epoxy and a top coat of the Mapefloor Finish 57 was installed as a final abrasion-resistant floor coating. The applicator recommended the Mapefloor Finish 57 to their customer due to their previous success with the product being used in a very aggressive environment. |
Anfangs- und Abschlussdatum | 2019 |
Art der Anwendung | Zement und Kunstharzbodenbeschichtungen |
Bauunternehmen | Epoxy Flooring |
Installationsunternehmen | Epoxy Flooring |
Koordinierung von MAPEI | Scott Lacey |