Rothorn Sörenberg

Location icon Sörenberg, Schweiz
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Ref.-Nr.: 4658
Kategorie: Infrastruktur

Bauwesen

Baustelle ceiling of the passage tunnel
Standort Sörenberg, Schweiz
Unterkategorie Tunnel
Anwendung At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Anfangs- und Abschlussdatum 2023
Art der Anwendung Tiefbau
Installationsunternehmen Gasser Felstechnik AG, Lungern
Projektmanager Rothornbahn Sörenberg
Bildnachweise Ramon Lehmann Fotografie
Koordinierung von MAPEI Urs Wirth

Im Projekt verwendete(s) Produkt(e)

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Chloridfreier, schwindkomensierter Montageblitzzement. Anwendungsbereiche: Für…
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Produkt wurde ersetzt oder ist nicht für diesen Markt vorgesehen.
Bitte kontaktieren Sie uns bei Fragen.
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Produkt wurde ersetzt oder ist nicht für diesen Markt vorgesehen.
Bitte kontaktieren Sie uns bei Fragen.

Bleiben Sie in Kontakt

Melden Sie sich für unseren Newsletter an, um stets über Neuigkeiten von MAPEI informiert zu werden