Typ stavby | The 35.5-metre-high grain silo with 19 interior grain chambers has space for 2 800 tonnes of grain. The grain silo was built in 24-hour operation. Construction took a total of 212 hours, or just under nine days. |
---|---|
Lokace | Hallau, Švýcarsko |
Podkategorie | SILOS |
Aplikace | The new construction of the additional grain silo in Hallau was built in 24-hour operation. The building was erected using slipforming, which was raised in three-minute cycles. |
Datum zahájení a ukončení | 2022 |
Typ aplikace | Sanace betonu |
Instalační společnosti | KIBAG Beton AG |
Designéři | Neumühle Hallau GmbH |
MAPEI Cordination | Reto Märki |