Typ stavby | The existing gallery was extended by 320 metres with the new building. |
---|---|
Lokace | Disentis, Švýcarsko |
Podkategorie | TUNNEL |
Aplikace | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
Datum zahájení a ukončení | 2021 |
Typ aplikace | Údržba silničních těles |
Instalační společnosti | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
Designéři | Kanton Graubünden |
MAPEI Cordination | Marco Jungi |