Rothorn Sörenberg

Location icon Sörenberg, Švýcarsko
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Ref #: 4658
Kategorie: INFRASTRUKTURA

Stavba

Typ stavby ceiling of the passage tunnel
Lokace Sörenberg, Švýcarsko
Podkategorie TUNNEL
Aplikace At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Datum zahájení a ukončení 2023
Typ aplikace Podzemní stavby
Instalační společnosti Gasser Felstechnik AG, Lungern
Designéři Rothornbahn Sörenberg
Fotografové Ramon Lehmann Fotografie
MAPEI Cordination Urs Wirth

Výrobek použitý v projektu

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not avalaible for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not avalaible for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not avalaible for this market,
contact us

Zůstaňte ve spojení

Přihlaste se k odběru newsletterů