Yarda | New wood-look PVC flooring was laid on 664 m2. |
---|---|
Ubicación | Villars-sur-Glâne, Suiza |
Subcategoría | GUARDERÍA |
Aplicación |
The floor of the Cap Canaille day care centre was renovated. The existing tiles were sanded down and spot filling was carried out with Planiprep Fast Track.
Then the very low-emission bonding primer Eco Prim Plus was applied and smoothed with Ultrabond Eco Xtra. Thanks to these substrate preparations, the new PVC flooring met the local standards. |
Fecha de inicio y finalización | 2021 |
Tipo de aplicación | Floor/wall covering |
Arquitectos | FACE à FACE à Genève |
Gestor de proyectos | Cap Canaille du groupe Babilou |
Coordinación de MAPEI | Marcello Maieron |