场地 | pools and wet areas |
---|---|
位置 | West Bromwich , 英国 |
子目录 | 体育中心 |
建于 | 2013 |
打开 | 2014 |
施工 | waterproofing and ceramic tiles installation |
开始和结束日期 | 2013/2014 |
施工类型 | 新建筑 |
承包商公司 | Pellikann |
建筑师 | Roberts Limbrick |
描述 | Mapei was specified throughout for a system build up and warrantable system. Mapei products were used from the concrete up to the finishing materials, including screed, render, waterproofing, tile adhesives, grout and silicones. Various detailing issues were overcome with the inclusion of the technical department assisting including the drainage channels. This project is the first for Pellikann where a single manufacturer has been used like this and this will now be rolled out for future leisure centres using Mapei products. Full site support has been given with various visits made to site to follow through on works and assisting both the Main contractors and sub contractors |
订阅马贝电子资讯以获取最新的马贝动态