Void bridge

Location icon Void-Vacon, 法国
Renovation of the bridget to strengthen its concrete foundations and deck
编号#: 6107
类别: 交通工具

建筑

场地 concrete admixtures
位置 Void-Vacon, 法国
子目录 桥梁
施工 Supply of concrete admixtures
The Void canal bridge, overlooking the Marne-Rhine canal in the Meuse in France, has been renovated. This major renovation project was to strengthen its foundations and its deck. Mandated by the company Berthold, our client Chardot TP delivered all the concrete, formulated using MAPEI admixtures: foundation concrete c20 / 25 xc2, c35 / 45 xc4 xf1, concrete C35 / 45 xf4, concrete C45 / 55 or even self-compacting. The deck bridget were poured using two pumps simultaneously, one of 46m and the other of 47m!
开始和结束日期 2021
施工类型 外加剂
业主 Chardot TP
承包商公司 Berthold
Project Manager Vivien Wack
描述 Fabrication et livraison du béton : Chardot TP

本项目 使用的产品

DYNAMON EASY 630
DYNAMON EASY 630
Product not available for this market,
contact us
DYNAMON XTEND W333
DYNAMON XTEND W333
Product not available for this market,
contact us

保持联系

订阅马贝电子资讯以获取最新的马贝动态

提交