场地 | Interior floor protection for a dog daycare and boarding facility in Auckland looking after over 500 dogs at various times. 800m2 floor split into 5 different areas for different activities |
---|---|
位置 | 新西兰 |
子目录 | 总督府 |
施工 |
Installation of Mapeoor Sytem 31 HD with Mapeoor Finish 57
The concrete floor was ground using an industrial grinder and a coat of Primer SN epoxy primer was installed. This was followed by a coat of the Mapefloor I 302 SL high build solvent-free epoxy and a top coat of the Mapefloor Finish 57 was installed as a final abrasion-resistant floor coating. The applicator recommended the Mapefloor Finish 57 to their customer due to their previous success with the product being used in a very aggressive environment. |
开始和结束日期 | 2019 |
施工类型 | 树脂/水泥基地面 |
承包商公司 | Epoxy Flooring |
安装公司 | Epoxy Flooring |
马贝协调员 | Scott Lacey |
订阅马贝电子资讯以获取最新的马贝动态