场地 | Storage yards covering an area of 18.6 hectares |
---|---|
位置 | Gdynia, 波兰 |
子目录 | 港口 |
建于 | 2020 |
打开 | 2022 |
施工 | . Storage yards covering an area of 18.6 hectares were constructed in the Port of Gdynia. Concrete floors were completed with Mapei fibers and admixtures. |
开始和结束日期 | 2021/2022 |
施工类型 | 外加剂 |
业主 | Port of Gdynia Authority S.A |
承包商公司 | NDI Sp. z o.o. |
安装公司 | Painpol, Dromaxx |
积分 | NDI Group |
马贝协调员 | Jordan Adamczewski |
订阅马贝电子资讯以获取最新的马贝动态