场地 | tennis courts and netball courts |
---|---|
位置 | Ascot Vale (Melbourne), 澳大利亚 |
子目录 | 高尔夫俱乐部, 网球场地 |
施工 |
Installation of Mapecoat System on tennis courts and netball courts
Surface Preparation sequence; • Clean and prep new concrete bases post 28 days curing using a combination of mechanical (diamond) grinding and high-pressure water blasting. Surfacing System sequence; • Apply ‘Mapecoat I 600 W Primer’ to courts. • Minor patching & levelling of new concrete surface as required using Mapecoat TNS White Base Coat • Apply ‘Mapecoat TNS Finish 1 – Velocity Blue’ to the centre of courts. (First ‘finish’ coat) • Apply ‘Mapecoat TNS Finish 1 – Velocity Blue’ to the centre of courts. (Second ‘finish’ Coat) • Apply ‘Mapecoat TNS Finish 1 – True Blue’ to the perimeter of courts. (First ‘finish’ Coat) • Apply ‘Mapecoat TNS Finish 1 – True Blue’ to the perimeter of courts. (Second ‘finish’ Coat) • Apply ‘Mapecoat TNS White Lines’ for tennis to courts. • Apply ‘Mapecoat TNS Yellow Lines’ for netball to courts. |
开始和结束日期 | 2019 |
施工类型 | 运动地板施工方案, 基面准备 |
业主 | Tennis and Netball Centre |
承包商公司 | Turf One Pty Ltd |
安装公司 | King of Courts Pty Ltd |
Project Manager | Moonee Valley City Council |
马贝协调员 | Nicolas Cheal |
在这里,您可以下载与该项目相关的所有文档
订阅马贝电子资讯以获取最新的马贝动态