场地 | Construction of a surgical centre |
---|---|
位置 | RENNES, 法国 |
子目录 | 医院 |
建于 | 2021 |
施工 |
Construction of a surgical centre
Construction of a surgical centre, then construction of a mother-child centre, Construction of a regional cancer institute in 2023, Phase 2 : construction of two hospital buildings 2025, Phase 3 : creation of a biology institute and demolition of the hospital block. The feet of the cranes will be sunk into a solid mass and will be used to create a patio. |
开始和结束日期 | 2022 |
施工类型 | 新建筑 |
安装公司 | VINCI SOGEA OUEST |
项目经理 | SOGEA - EDEIS - R2M - |
马贝经销商 | BHR |
马贝协调员 | Stéphane GIRADEAU |
订阅马贝电子资讯以获取最新的马贝动态