场地 | Business Park |
---|---|
位置 | 新加坡 |
子目录 | 购物中心 |
建于 | 2014 |
打开 | 2016 |
施工 | installation of ceramics and stone materials inside and outside |
开始和结束日期 | 2015/2016 |
施工类型 | 地面/墙面面层材料 |
业主 | Shimizu Corporation |
承包商公司 | Shimizu Corporation |
安装公司 | CSC Holdings Limited, Yangzijian International (S) Pte Ltd |
建筑师 | DCA Architect |
马贝经销商 | Mapei Far East Pte Ltd |
马贝协调员 | Ryan Liaw (Mapei Far East, Singapore) |
描述 | Soon after the completion of MBC phase 1, major issues on the tile bonding surfaced. Installation materials were supplied by Laticrete. Tiles from the toilets debonded causing potential danger. At the request of the owner, Mapei did a thorough site inspect |