场地 | Klang Valley Mass Rapid Transit (KVMRT) |
---|---|
位置 | 马来西亚 |
子目录 | 地铁 |
建于 | 2013 |
打开 | 2014 |
施工 | Klang Valley Mass Rapid Transit (KVMRT) - Bukit Bintang Central Underground Station |
开始和结束日期 | 2013/2014 |
施工类型 | 防水 |
业主 | Mass Rapid Transit Corporation Sdn Bhd |
承包商公司 | MMC Gamuda KVMRT (T) Sdn Bhd |
安装公司 | CRT Specialist (M) Sdn Bhd |
建筑师 | Mott MacDonald (M) Sdn Bhd (Engineers) |
马贝经销商 | Mapei Malaysia Sdn Bhd |
描述 |
The Bukit Bintang Central station is constructed using the “cut-and-cover” method with a total excavation depth of 33m. It has a footprint of 150m x 19.0m with depths of 16.9m from existing ground level to the top of rail level for the upper platform and 30.4m to the top of rail level for the lower platform. The station consists of four levels namely concourse, upper platform, plant-room platform and lower platform. The main contractor wanted a durable, high-performance waterproofing system, "MAPEI Purtop" for the roof slab to provide long-term, low-maintenance protection against water ingress. (The walls were protected using a drainage system.) |