场地 | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
---|---|
位置 | Hérémence, 瑞士 |
子目录 | 酒店/旅馆 |
施工 | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
开始和结束日期 | 2022 |
施工类型 | 墙地面面材 |
建筑师 | Mijong Architecture Design |
项目经理 | Grande Dixence SA |
马贝协调员 | Marcello Maieron |
订阅马贝电子资讯以获取最新的马贝动态