场地 | The 35.5-metre-high grain silo with 19 interior grain chambers has space for 2 800 tonnes of grain. The grain silo was built in 24-hour operation. Construction took a total of 212 hours, or just under nine days. |
---|---|
位置 | Hallau, 瑞士 |
子目录 | 筒仓 |
施工 | The new construction of the additional grain silo in Hallau was built in 24-hour operation. The building was erected using slipforming, which was raised in three-minute cycles. |
开始和结束日期 | 2022 |
施工类型 | 混凝土修复 |
安装公司 | KIBAG Beton AG |
项目经理 | Neumühle Hallau GmbH |
马贝协调员 | Reto Märki |