场地 | viaduct |
---|---|
位置 | Prilly, 瑞士 |
子目录 | 桥梁, 高架桥 |
施工 |
To create space and ensure accessibility for all modes of transportation on the street "Rue de Lausanne", the earthen embankment that extended the historic Malley viaduct, dating from 1922, has been excavated.
It was replaced by a modern 141 m viaduct. The R4 mortar Mapegrout Grunite was used to protect the bituminous waterproofing on the parapets. Mapegrout Grunite was applied to the bituminous waterproofing with a special pray machine. In addition, a custom-made reinforcement grid was used to support the mortar between the bridge deck and the parapet wall. |
开始和结束日期 | 2023/2024 |
施工类型 | 基面准备 |
承包商公司 | Transports Publics Lausannois, Lausanne |
安装公司 | Isotech VD, Etagnières |
建筑师 | BG Ingénieurs, Lausanne |
马贝协调员 | Alexandre Perona |
订阅马贝电子资讯以获取最新的马贝动态