Rothorn Sörenberg

Location icon Sörenberg, 瑞士
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
编号#: 4658
类别: 交通工具

建筑

场地 ceiling of the passage tunnel
位置 Sörenberg, 瑞士
子目录 隧道
施工 At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
开始和结束日期 2023
施工类型 地下建筑物
安装公司 Gasser Felstechnik AG, Lungern
项目经理 Rothornbahn Sörenberg
积分 Ramon Lehmann Fotografie
马贝协调员 Urs Wirth

本项目 使用的产品

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not available for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not available for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not available for this market,
contact us

保持联系

订阅马贝电子资讯以获取最新的马贝动态

提交