场地 | Floor required upgrading to meet Food & Hygiene standards |
---|---|
位置 | Auckland, 新西兰 |
子目录 | 工业 |
建于 | 2015 |
打开 | 2015 |
施工 | Chelsea Suger Refinery floor upgrade |
开始和结束日期 | 2015 |
施工类型 | 地坪 |
业主 | Chelsea Suger Refinery |
安装公司 | Topcaot Specialist Coatings Ltd |
马贝经销商 | Mapei NZ Ltd |
积分 | Scott Lacey |
Project Manager | Peter Shepherd |
描述 | The existing floor of the processing plant was breaking down and was required to be bought back to Food and Hygiene standards as required by law. Mapefloor CPU Rt and Mapefloor CPU TC were applied. |
订阅马贝电子资讯以获取最新的马贝动态