场地 | piles and decks, bridge motorway |
---|---|
位置 | A13 Bologna-Padua, 意大利 |
子目录 | 桥梁, 机动车路 |
建于 | 1970 |
打开 | 1970 |
施工 | supplying products for structural strengthening and concrete repair |
开始和结束日期 | 2021/2022 |
施工类型 | 混凝土修复, 结构加固 |
业主 | Autostrade per l’Italia SpA |
承包商公司 | Divisione Cantieri Stradali, Mario Iorio |
安装公司 | Divisione Cantieri Stradali |
建筑师 | Massimo Acanfora |
项目经理 | Static tester: Prof. Andrea Prota Operational direction: Pasquale Staropoli, Ciro Valerio Executional safety coordinator: Gaetano Mascetta Technical-administrative testing: Alessandro Zamboni, Piero Indelli |
Project Manager | Giuseppe Turco (ASPI Bologna) |
马贝协调员 | Giulio Morandini, Gianpiero Peluso, Davide Demicheli, Corrado Castiglioni, Mapei SpA (Italy) |
描述 | Site direction: Gennaro Sorrentino, Andrea Carraretto |
订阅马贝电子资讯以获取最新的马贝动态