场地 | Preparation and Installation of Floor and Wall Coverings |
---|---|
位置 | Hobart, 澳大利亚 |
子目录 | 医院 |
建于 | 2017 |
打开 | 2019 |
施工 |
Supply of surface preparation, waterproofing and adhesives to install both wall and floor coverings
The Royal Hobart Hospital is Tasmania's largest hospital and the major teaching hospital of the University of Tasmania. The redevelopment of the Hospital comprises a new multi-level building that will accommodate inpatient facilities, operating theatres and interventional suites above an existing ward building on Campbell Street. It will include a women's and children's precinct, a maternity ward, delivery and birthing suites, a dedicated adolescent unit and a paediatric ward. The scope of the project included construction of 39,000 m2 of new space and refurbishment of 11,000 m2 of existing clinical areas (including early works) and site-wide infrastructure upgrades. |
开始和结束日期 | 2017/2019 |
施工类型 | 地面/墙面面层材料, 基面准备, 防水 |
业主 | Tasmanian Department of Health |
承包商公司 | John Holland |
安装公司 | Floor91 |
建筑师 | Lyons Architects |
Project Manager | Shane Ward |
马贝协调员 | Jamie Billing |
订阅马贝电子资讯以获取最新的马贝动态