场地 | Angereds Bad och isanläggning |
---|---|
位置 | Angered, 瑞典 |
子目录 | 游泳池 |
建于 | 2012 |
打开 | 2013 |
施工 | Angereds Bad och isanläggning |
开始和结束日期 | 2012/2013 |
施工类型 | 防水 |
业主 | Higab gruppen |
承包商公司 | PEAB AB |
安装公司 | Åskloster Mur o Kakel AB |
建筑师 | Erseus Arkitekter AB |
项目经理 | Peter Erseus |
马贝经销商 | Göteborgs Kakelhus |
积分 | Marie Sködin |
Project Manager | Magnus Attemalm |
描述 |
Construction of a public arena in Angered (Gothenburg) This arena was originally a contest between architect companies. The goal was to construct a combined swim bath, ice arena and athletics arena “in one”. The winner became Erseus architects AB. Directly when the winner was announced Mapei and Modena took contact, and together we formed a concept with ceramics, membranes, adhesives and grouts for the swimming pools and surrounding areas such as showers, spa area and changing rooms for all parts. The swimming pool concept is from concrete repair and surface preparing until finished surfaces. |