场地 | road tunnel |
---|---|
位置 | Euseigne, 瑞士 |
子目录 | 隧道 |
施工 |
Water ingress and deformation led to the formation of ice above the road surface in the tunnel in winter.
First of all, water ingress was sealed and drained off with Mapeband Flex Roll / Adesilex PG 4. The water-bearing construction joints in the concreted section were also sealed. The shotcrete surface was primed with Eporip and reprofiled with Mapegrout Easy Flow. The side walls were then primed to a height of 4 m above the road surface with Mapcoat WT, a two-component epoxy finish. The tunnel coating Mapecoat W HRI was applied with a low degree of soiling. |
开始和结束日期 | 2023 |
施工类型 | 地下建筑物 |
安装公司 | Trauffer AG Bautenschutz, Sarnen |
建筑师 | Canton Valais |
项目经理 | Canton Valais |
积分 | Fotograf Armin Karlen |
马贝协调员 | Stefan Niederberger |
订阅马贝电子资讯以获取最新的马贝动态