Renvation of the Tunnel de la Clusette

Location icon Noiraigue, 瑞士
编号#: 4662
类别: 运输

建筑

场地 road tunnel, safety tunnel
位置 Noiraigue, 瑞士
子目录 隧道
施工 After 50 years of service, the 1 km long Tunnel de la Clusette no longer met the required safety standards.
It was repaired with our sealing products. The project essentially comprises the renovation of the existing tunnel and the construction of a safety tunnel parallel to the road tunnel, which will enable the tunnel to be evacuated in the event of a fire. It should also be possible to use the safety tunnel as a pedestrian and cycling path.
开始和结束日期 2022/2026
施工类型 地下建筑物
安装公司 Renesco AG, Moosseedorf
建筑师 Groupement BG ingénieurs conseils SA, Marin-Epagnier | OPAN concept SA, Neuchâtel
项目经理 Canton Neuchâtel
马贝协调员 Stefan Niederberger