La Calinésie : 3500 m² of Aquapark

Location icon 法国
Aquatic center - Libourne (33)
编号#: 6109
类别: 旅游与健康

建筑

场地 Interior and exterior, pools
位置 法国
子目录 水上运动中心
建于 2020
打开 2021
施工 Supply of the products necessary for the preparation of the supports, waterproofing, gluing of the gluing the tiles and making the joints
Areas created by CMB with MAPEI solutions : 1 sports pool with movable floor (525 m²) 1 learning-recovery pool (168 m²) Sports hall with bleachers and entrance hall 1 leisure pool (200 m²) 1 animated paddling pool (40 m²) 1 balneotherapy and relaxation pool (50 m²) 3 thematic baths 1 hammam and 1 sauna Showers and massage showers Changing rooms and sanitary facilities Pool decking Various rooms: 2 massage rooms, herbal tea room, back office premises 6,900 m² of tiling laid
开始和结束日期 2020/2021
施工类型 基面准备, Tile & stone installation systems, 防水
业主 La Cali (Communauté d'Agglomération du Libournais)
安装公司 CMB
建筑师 AP-MA Architectures, ACTION ARCHI
项目经理 DEKRA INDUSTRIAL, SEBAT, SOJA INGENIERIE
积分 Quentin Belloncle, Géraldine Bruneel
马贝协调员 Laurie Saintenac

附加附件

在这里,您可以下载与该项目相关的所有文档

保持联系

订阅马贝电子资讯以获取最新的马贝动态

提交