Yard | Interior floor protection for a dog daycare and boarding facility in Auckland looking after over 500 dogs at various times. 800m2 floor split into 5 different areas for different activities |
---|---|
Location | New Zealand |
Subcategory | DOGE'S PALACE |
Application |
Installation of Mapeoor Sytem 31 HD with Mapeoor Finish 57
The concrete floor was ground using an industrial grinder and a coat of Primer SN epoxy primer was installed. This was followed by a coat of the Mapefloor I 302 SL high build solvent-free epoxy and a top coat of the Mapefloor Finish 57 was installed as a final abrasion-resistant floor coating. The applicator recommended the Mapefloor Finish 57 to their customer due to their previous success with the product being used in a very aggressive environment. |
Start and finish date | 2019 |
Application Type | Cemetitious and resin floor coverings |
Contractor company | Epoxy Flooring |
Installer companies | Epoxy Flooring |
MAPEI Coordination | Scott Lacey |