Yard | A Mapei resilient flooring system has been used to complete an extensive project at The Cocoa Works in York. |
---|---|
Location | York, United Kingdom |
Subcategory | APARTMENTS |
Application |
Installed by Titan Flooring, the project spanned apartment living rooms, bedrooms and corridors throughout the luxury redevelopment, on the site of the former iconic Rowntree Factory.
The project was completed by Henry Boot Construction for Latimer – the development arm of Clarion Housing Group. Originally dating back to the 1890s, the Rowntree Factory is located on an eight-hectare site of historical significance. Derelict for over a decade, the building has been sensitively restored, with the new characterful-contemporary design embracing original features throughout. Designed by Weedon Architects, the building includes 279 luxury one, two and three-bed apartments surrounded by landscaped gardens and external spaces. Floor preparation works were completed throughout the historic site using two Mapei products. They included ECO Prim T Plus universal acrylic primer and Ultraplan Renovation Screed 3240 – a fibre-reinforced smoothing compound. Both the primer and screed feature very low VOC EMICODE: EC1 Plus formulations. |
Application Type | Installation of floors |
Contractor company | Henry Boot Construction |
Installer companies | Titan Flooring |
Architects | Weedon Architects |
Specialists involved | Latimer – the development arm of Clarion Housing Group |
Unit 6, RM 901, Port Center, No.406, Yanjiangzhong Road, Yuexiu District, Guangzhou, P.R. China
Tel 020-83653489
Mapei Building Materials Technology (Zhejiang) Co., Ltd
No.1633, Shilin Road, Wuxing, Huzhou, Zhejiang, China
Tel: 0572-215 9888
E-mail: enquiry@mapei.com.cn