Yard | The Sahligut learning swimming hall was completely renovated. The overall renovation included a new chrome steel swimming pool and a new glass façade, the complete replacement of the pool water technology and the redesign of the cloakroom area. |
---|---|
Location | Biel, Switzerland |
Subcategory | Aquatic Centre |
Application | The teaching pool at the Sahligut school was built between 1967 and 1968. After 50 years of operation, a comprehensive renovation was urgently needed. |
Start and finish date | 2021/2022 |
Application Type | Floor/wall covering |
Architects | Leimer Tschanz Architekten AG, Viaduktstr. 33, 2501 Biel Natalie Wyss Architektin |
Specialists involved | Stadt Biel/Bienne Tobias Grimm Architekt und Projektleiter |
MAPEI Coordination | Pirmin Nünlist |
Unit B1-15/16, 1904 Innovation Park, Dabancang, No.36, Xinmin 8th Street, Haizhu District, Guangzhou, P.R. China
Tel 020-83653489
Mapei Building Materials Technology (Zhejiang) Co., Ltd
No.1633, Shilin Road, Wuxing, Huzhou, Zhejiang, China
Tel: 0572-215 9888
E-mail: enquiry@mapei.com.cn