State Chancellery of the State of North Rhine-Westphalia

Location icon Düsseldorf, Germany
Ref #: 5620
Category: PUBLIC BUILDINGS/PLACES

Construction

Yard State office
Location Düsseldorf, Germany
Subcategory OFFICES
Built in 1992
Opened in 1998
Application Supply of products to make and waterproof substrates and to install stone slabs on the external steps
Start and finish date 2016
Application Type Installation of floors
Client Hannover Leasing GmbH & Co. KG
MAPEI Distributor Schmidt Rudersdorf
MAPEI Coordination Marcus Winkler, Volker Harter (Mapei GmbH)

Additional Attachments

Here you can download all documents related to this project

Product used for the project

ELASTORAPID
ELASTORAPID
Two-component, high-performance, highly-deformable, quick-setting and drying…
MAPENET 150
MAPENET 150
Alkali-resistant glass fibre mesh (in compliance with the ETAG 004 guide) for…
MAPESIL LM
MAPESIL LM
From the Mapei laboratories, the neutral silicone for sound sealing of stone ,…
PLANICRETE
PLANICRETE
Synthetic rubber latex for improving adhesion and mechanical strength of…
TOPCEM
TOPCEM
Special normal-setting, quick-drying (4 days), controlled-shrinkage hydraulic…
TOPCEM PRONTO
TOPCEM PRONTO
Ready-to-use, normal-setting, controlled-shrinkage mortar with high thermal…
MAPELASTIC
MAPELASTIC
Product not available for this market,
contact us
2608 - PLANITOP FAST 330
PLANITOP FAST 330
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news