Yard | Business Park |
---|---|
Location | Singapore |
Subcategory | MALL |
Built in | 2014 |
Opened in | 2016 |
Application | installation of ceramics and stone materials inside and outside |
Start and finish date | 2015/2016 |
Application Type | Floor/wall covering |
Client | Shimizu Corporation |
Contractor company | Shimizu Corporation |
Installer companies | CSC Holdings Limited, Yangzijian International (S) Pte Ltd |
Architects | DCA Architect |
MAPEI Distributor | Mapei Far East Pte Ltd |
MAPEI Coordination | Ryan Liaw (Mapei Far East, Singapore) |
Other | Soon after the completion of MBC phase 1, major issues on the tile bonding surfaced. Installation materials were supplied by Laticrete. Tiles from the toilets debonded causing potential danger. At the request of the owner, Mapei did a thorough site inspect |
Here you can download all documents related to this project
Unit B1-15/16, 1904 Innovation Park, Dabancang, No.36, Xinmin 8th Street, Haizhu District, Guangzhou, P.R. China
Tel 020-83653489
Mapei Building Materials Technology (Zhejiang) Co., Ltd
No.1633, Shilin Road, Wuxing, Huzhou, Zhejiang, China
Tel: 0572-215 9888
E-mail: enquiry@mapei.com.cn