Latymer Upper School

Location icon London, United Kingdom
Ref #: 8
Category: PUBLIC BUILDINGS/PLACES

Construction

Yard pools and locker rooms
Location London, United Kingdom
Subcategory SCHOOL
Opened in 2016
Application waterproofing and ceramics installation
Application Type Floor/wall covering
Contractor company Jerram Faulkus
Installer companies Tiletec Group
Other Throughout the extensive project, Mapei systems were specified from the substrate to the finishing materials, in order to provide a warrantable system build-up. The total application included 2,500 m2 of Mapei products from screed binders, render substrates and a range of floor and wall adhesives.

The new two-storey building consists of a six lane competition swimming pool and wet changing facilities on the ground floor. The second floor comprises of a fitness suite with the project including a re-fit of existing sports hall and dry changing areas.

Product used for the project

GRANIRAPID
GRANIRAPID
GRANIRAPID is a two-component, fast-setting and hydrating , deformable ,…
KERAFLEX
KERAFLEX
High-performance cementitious adhesive with no vertical slip and extended open…
MAPELASTIC
MAPELASTIC
Two-component, flexible cementitious mortar for waterproofing balconies,…
PLANITOP FAST 330
PLANITOP FAST 330
Product not available for this market,
contact us
4007
4007
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news