Yard | Klang Valley Mass Rapid Transit (KVMRT) |
---|---|
Location | Malaysia |
Subcategory | METRO |
Built in | 2013 |
Opened in | 2014 |
Application | Klang Valley Mass Rapid Transit (KVMRT) - Bukit Bintang Central Underground Station |
Start and finish date | 2013/2014 |
Application Type | Waterproofing |
Client | Mass Rapid Transit Corporation Sdn Bhd |
Contractor company | MMC Gamuda KVMRT (T) Sdn Bhd |
Installer companies | CRT Specialist (M) Sdn Bhd |
Architects | Mott MacDonald (M) Sdn Bhd (Engineers) |
MAPEI Distributor | Mapei Malaysia Sdn Bhd |
Other |
The Bukit Bintang Central station is constructed using the “cut-and-cover” method with a total excavation depth of 33m. It has a footprint of 150m x 19.0m with depths of 16.9m from existing ground level to the top of rail level for the upper platform and 30.4m to the top of rail level for the lower platform. The station consists of four levels namely concourse, upper platform, plant-room platform and lower platform. The main contractor wanted a durable, high-performance waterproofing system, "MAPEI Purtop" for the roof slab to provide long-term, low-maintenance protection against water ingress. (The walls were protected using a drainage system.) |
Unit B1-15/16, 1904 Innovation Park, Dabancang, No.36, Xinmin 8th Street, Haizhu District, Guangzhou, P.R. China
Tel 020-83653489
Mapei Building Materials Technology (Zhejiang) Co., Ltd
No.1633, Shilin Road, Wuxing, Huzhou, Zhejiang, China
Tel: 0572-215 9888
E-mail: enquiry@mapei.com.cn