Yard | The existing gallery was extended by 320 metres with the new building. |
---|---|
Location | Disentis, Switzerland |
Subcategory | TUNNEL |
Application | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
Start and finish date | 2021 |
Application Type | Roading |
Installer companies | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
Specialists involved | Kanton Graubünden |
MAPEI Coordination | Marco Jungi |