Cantiere | The Sahligut learning swimming hall was completely renovated. The overall renovation included a new chrome steel swimming pool and a new glass façade, the complete replacement of the pool water technology and the redesign of the cloakroom area. |
---|---|
Località | Biel, Svizzera |
Sottocategoria | Centro acquatico |
Intervento | The teaching pool at the Sahligut school was built between 1967 and 1968. After 50 years of operation, a comprehensive renovation was urgently needed. |
Inizio e fine dei lavori | 2021/2022 |
Tipo di intervento | Pavimenti |
Progettisti | Leimer Tschanz Architekten AG, Viaduktstr. 33, 2501 Biel Natalie Wyss Architektin |
Specialisti coinvolti nei lavori | Stadt Biel/Bienne Tobias Grimm Architekt und Projektleiter |
Coordinatore MAPEI | Pirmin Nünlist |