Rothorn Sörenberg

Location icon Sörenberg, Svizzera
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Rif n°: 4658
Categoria: Infrastrutture

Cantiere

Cantiere ceiling of the passage tunnel
Località Sörenberg, Svizzera
Sottocategoria GALLERIA
Intervento At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Mit einer Spritzbetonschicht wird dieser versiegelt, so dass keine weiteren Felsbrocken herunterfallen können. Beim Tunnelausgang Seite Eisee sind grössere Tropfstellen zu beobachten. Diese werden mit Mapelastic TU System abgedichtet sowie mit einer Halbschale oder Noppenfolie in eine Rigole abgeleitet. Dies verhindert, dass über Kopf Eisflächen entstehen und die Sicherheit der Wintersportler gewährleistet ist.
Inizio e fine dei lavori 2023
Tipo di intervento Costruzioni in sotterraneo
Imprese esecutrici Gasser Felstechnik AG, Lungern
Specialisti coinvolti nei lavori Rothornbahn Sörenberg
Credits Ramon Lehmann Fotografie
Coordinatore MAPEI Urs Wirth

Prodotti utilizzati per il progetto

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Vorgemischter, schwindkompensierter, schnell abbindender und schnell…
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Membrana impermeabile da applicare a spruzzo caratterizzata da alta…
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Pulverförmiger, alkalifreier Erstarrungsbeschleuniger für Spritzbeton…