Cantiere | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
---|---|
Località | Hérémence, Svizzera |
Sottocategoria | HOTEL |
Intervento | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
Inizio e fine dei lavori | 2022 |
Tipo di intervento | Pavimenti |
Progettisti | Mijong Architecture Design |
Specialisti coinvolti nei lavori | Grande Dixence SA |
Coordinatore MAPEI | Marcello Maieron |