CASA HABITACION de valor histórico en Guanajuato

Location icon Messico
The house is a semi-urban agricultural structure that was transformed into the Neoclassical style in the 1850s. Stone from the region was used in the building, and the floors and ornamental elements of the structure give the house warmness and elegance.
Rif n°: 103
Categoria: Edifici residenziali

Cantiere

Cantiere Stone floor, Wall covering, Wall lime paint
Località Messico
Sottocategoria ABITAZIONE
Costruito nel 1850
Inaugurato nel 1850
Intervento The house is a semi-urban agricultural structure that was transformed into the Neoclassical style in the 1850s. Stone from the region was used in the building, and the floors and ornamental elements of the structure give the house warmness and elegance.
The house is a semi-urban agricultural structure that was transformed into the Neoclassical style in the 1850s. Stone from the region was used in the building, and the floors and ornamental elements of the structure give the house warmness and elegance. After removing the old and damaged flattening, the following process was the consolidation of the joints in the masonry with Vitruvio Repello. The next step was the anchoring flattening with Vitruvio Repello Base at 1.5 cm thickness. The second layer was placed with Vitruvio Fine Finish at 1.5 cm thickness. Finally, the Silancolor System was applied: Primer, Base and White Paint. Only Mapei lime base products, and the MapeAntique line were applied. It is important to highlight the care installation on the volcanic stone, tezontle, and clay floor coverings. In fact, there was a previous selection of these floor coverings considering their brightness and intensity of color to combine them properly with the natural stones. Project information Period of construction: Three courtyards one for each century XVIII, XIX y XX Year of MAPEI involvement: 2018-2021 MAPEI Coordinator: Max Alvarez & Carlos Terrazas Project Owner: María Soledad Hernández Ruiz MAPEI Distributors: María del Carmen Pérez Díaz Architect: Hectór Manuel Mosqueda Hernández General Contractor: Intersección Arquitectos, S.A. de C.V. Photographer: Sergio Zárate Project size: approx. 850 m
Inizio e fine dei lavori 2018/2021
Tipo di intervento Pavimenti, Posa di pavimenti, Recupero murature, Tile & stone installation systems
Committente María Soledad Hernández Ruiz
Impresa appaltatrice Intersección Arquitectos, S.A. de C.V.
Distributore MAPEI María del Carmen Pérez Díaz
Credits Sergio Zárate
Direttore lavori Hectór Manuel Mosqueda Hernández
Coordinatore MAPEI Max Alvarez & Carlos Terrazas
Link alla pagina di dettaglio https://youtu.be/Ek1b_R8t8YI