Cantiere | Concrete repair, waterproofing of 528-foot (161-m) drainage tunnel, structural crack reinforcement |
---|---|
Località | Granby, Canada |
Sottocategoria | DIGA |
Costruito nel | 1975 |
Inaugurato nel | 1977 |
Intervento | After four decades in service, the Choinière Dam and its drainage tunnel were experiencing water infiltration from cracks and failing joints. Specialized products and expertise from MAPEI got the repairs done to keep the water out. |
Inizio e fine dei lavori | 2019/2021 |
Tipo di intervento | Recupero calcestruzzi, Costruzioni in sotterraneo, Impermeabilizzazione |
Committente | Government of Quebec |
Impresa appaltatrice | Inter-Cité Construction Ltd. |
Progettisti | Grazia Toma |
Distributore MAPEI | Geroquip Inc. |
Coordinatore MAPEI | Baltazar Basabe, Michel Lafortune and Hamza Ouziame |
Qui puoi scaricare tutti i documenti relativi al progetto